Phala App 2.0 Test Known Issue Fix Progress

In order to save everyone’s feedback time, here we will sort out the problems that have been obtained from the community and give a fix time.
I will continue to update the information here. Thanks for your active support!

Known issue list

Database issue

  1. There is a problem with the data related to the withdrawal of the pool, which leads to problems with the free delegation data at the same time
    —— Expected to be repaired within 5 days

Bugs of Functions

  1. There is a problem with the design of the delegate page chart
    —— Expected to be fixed before going live

  2. When choosing RPC of Phala Network, need to ban the mining and delegate pages, and automatically jump to the dashboard
    —— Expected to be fixed before going live

Loss of Functions

  1. There is a lack of a critical time chart for the withdrawal reminder, which is an expected function
    —— Estimated completion within three days

  2. Dashboard lacks the total asset curve, which is an expected function
    —— Estimated to be completed within 2 weeks

  3. The Dashboard lacks the NFT list, which is an expected function
    —— expected to be completed within three days

  4. The value of free delegation is missing in the Delegation NFTs list, and the delegate button is missing either
    —— expected to be completed within three days

  5. Worker management on the stakepool details page requires filters and sorting, which is an expected function
    —— Estimated completion within five days

  6. The Pool list lacks the Delegated value and tag (closed), which is an expected function
    —— Estimated completion within five days

  7. There is no delegatable in the filter, which is an expected function
    —— Estimated completion within three days

  8. The dashboard needs Crowdloan’s claim reward, which is an expected function
    —— Estimated to be completed before launch

  9. Vault address needs to be added under the id of the Vault details page, which is used to query the vault address and can be used to add a whitelist to the stakepool
    —— Estimated to be completed before launch

  10. Next to the Delegation NFT and personal delegation information, add 7days rewards, which is an expected function
    —— Estimated to be completed before launch

  11. “Track” has no jumping ability and will jump to polkadot.js.org, which is an expected function
    —— Estimated to be completed before launch

  12. Analytics charts, and charts on the Pool details page
    —— Estimated to be completed within one month

  13. Add NFT sorting by APR/APY on the My delegation page
    —— Estimated to be completed before launch

  14. When withdraw all is selected, the number of withdraws is displayed, and add option of withdraw all freedelegation (the minimum value of free and delegation)
    —— Estimated to be completed before launch

Description Suggestion

  1. Change the “closed” filter to “hide closed”, which is relatively clear
    —— Estimated completion within three days

  2. Add underline and detailed description to each word on the UI interface
    —— completed before going live

Design Optimization

  1. The account address of the dashboard must be reproducible, and the worker public key on the StakePool details page must be reproducible
    —— Estimated completion within five days

  2. When modifying the pool information, it can directly combine those saves into one. Then the pop-up window disappears automatically
    —— Estimated to be completed before launch

  3. When The value of W-PHA that can be unwrapped exceeds 100, an exclamation mark is displayed next to unwrap all, or the unwrapall button adds a little animation
    —— Estimated to be completed within one month

  4. The vault in the upper left corner of the Delegate and the nft number of the stakepool should be able to jump to my delegation and lock the corresponding screening
    —— Estimated to be completed within one month

  5. On the Delegate page, above the delegate of each card, add a line Your Available Balance (=w-pha+PHA)
    —— Estimated to be completed within one month

2 Likes